Key Points
- No Great Western Railway (GWR) trains will run to or from London Paddington on Saturday, November 28 and Sunday, November 29.
- The closure forms part of preparatory work for Network Rail’s £27.8 million upgrade of Dolphin Junction in Slough, Berkshire.
- Reading passengers travelling to central London are advised to use GWR services to Guildford, then change for South Western Railway (SWR) trains to London Waterloo.
- GWR will run additional non-stop trains between Reading and Guildford, with the journey expected to take about 30 minutes.
- A queuing system will operate at Reading station for passengers travelling to Guildford, Gatwick Airport and London Waterloo.
- Some GWR long-distance services will instead begin or end at Reading, while selected services will be diverted to London Euston.
- Special hourly GWR services will run between London Euston and Bristol Temple Meads, and between London Euston and Swansea or Carmarthen.
- These Euston services will not stop between London Euston and Swindon, including at Oxford, Didcot Parkway or Reading.
- Elizabeth line services will run only between Reading and Maidenhead; they will not operate through to Paddington, Abbey Wood or Shenfield.
- Heathrow Express and Elizabeth line services will not operate to or from Heathrow Airport during the closure.
- Replacement buses will run between Ealing Broadway and Slough, serving intermediate stations and Boston Manor for Tube connections.
- SWR services may be especially busy because of international rugby fixtures at Twickenham, with boarding controls and queuing arrangements expected.
- Further disruption is scheduled between London Paddington and Slough from December 27 to January 3.
London (South London News) November 23, 2026 — Reading rail passengers face a weekend of significant disruption as engineering work will close the main Great Western Railway route between Reading and London Paddington on Saturday, November 28 and Sunday, November 29.
- Key Points
- How will Reading passengers reach London?
- Which Reading services will still run?
- What is happening at Dolphin Junction?
- Which London stations will be used instead?
- What will happen to Elizabeth line and Heathrow services?
- What alternative travel is available elsewhere?
- Could rugby fixtures add pressure?
- What has GWR said?
- Will there be further disruption?
- Background of the development
- Prediction: How this development can affect passengers
No train services will operate between London Paddington and Slough throughout the two-day closure. As reported by the Reading Chronicle, GWR has confirmed that the works will affect all routes into London Paddington, with Reading passengers advised to travel via London Waterloo instead.
The disruption means passengers travelling between Reading and central London will not be able to use their usual direct services to Paddington. Instead, GWR is directing travellers to Guildford, where they can change for South Western Railway services to London Waterloo.
How will Reading passengers reach London?
To support the alternative route, GWR will operate an enhanced service between Reading and Guildford. The operator will run additional non-stop trains, with the journey between the two stations expected to take around 30 minutes.
From Guildford, passengers will be able to connect with South Western Railway services to London Waterloo. GWR has advised customers to plan journeys in advance and to check timetables before setting out.
A queuing system will be in operation at Reading station for passengers boarding trains towards Guildford, Gatwick Airport and London Waterloo. The Reading Chronicle reported that the arrangement will also apply to South Western Railway services towards Twickenham and London Waterloo.
The measures are intended to manage passenger flows at Reading during a weekend when alternative routes are expected to come under additional pressure.
Which Reading services will still run?
Although the Paddington route will be closed, a number of GWR services from Reading will continue to operate as normal.
According to information issued by GWR, services will continue between Reading and Didcot Parkway, Swindon, Bristol Parkway and Cardiff Central. Trains will also run between Reading and Bristol Temple Meads, Weston-super-Mare and Taunton.
Further services will operate between Reading and Newbury and Bedwyn, as well as between Reading and Exeter St Davids, Plymouth and Penzance. GWR will also run services between Reading and Oxford, Worcester, Great Malvern and Hereford.
Other continuing routes include Reading to Basingstoke, and Reading to Guildford and Gatwick Airport. GWR will also operate services between Swindon and Cheltenham Spa.
The operator has additionally confirmed that services will run between Slough and Windsor & Eton Central, and between Maidenhead and Didcot Parkway or Marlow. Services will also operate between Twyford and Henley-on-Thames.
What is happening at Dolphin Junction?
The closure is connected to preparatory work on Network Rail’s upgrade of Dolphin Junction in Slough. As reported by the BBC’s Charlotte Coles, the £27.8 million project involves replacing ageing points, improving the track layout and upgrading overhead line equipment.
The work is intended to form part of a wider programme of engineering upgrades across the Thames Valley. The weekend closure on November 28 and 29 is described as preparatory work, with the main phase of the project scheduled to take place between Christmas and New Year.
Network Rail’s work at Dolphin Junction will prevent GWR trains from running to or from London Paddington during the closure. The works are designed to improve reliability on the London Paddington to Thames Valley route once complete.
Which London stations will be used instead?
GWR services will either start and finish at Reading or operate via a diversionary route to London Euston. The BBC reported that connections via Waterloo and Marylebone will also be available.
Special GWR trains will operate between London Euston and Swindon, with some services extending to or from Swansea or Carmarthen via Bristol Parkway. Other special services will run between London Euston and Bristol Temple Meads or Weston-super-Mare.
These long-distance services will not pick up or drop off passengers between London Euston and Swindon. That means stations including Oxford, Didcot Parkway and Reading will not be served by these particular diverted trains.
GWR has advised passengers planning journeys during the closure to search for services to or from London Euston rather than London Paddington.
What will happen to Elizabeth line and Heathrow services?
The closure will also affect Heathrow Airport links. According to the Reading Chronicle, Heathrow Express and Elizabeth line services will be unable to operate to or from the airport during the disruption.
Passengers intending to travel to or from Heathrow have been urged to consider alternative transport options. The Elizabeth line will run only between Reading and Maidenhead, with no trains continuing through to Paddington, Abbey Wood or Shenfield.
The BBC reported that Elizabeth line and Heathrow Express services are expected to begin returning from New Year’s Eve. GWR services are due to resume access to Paddington from January 4.
What alternative travel is available elsewhere?
Replacement bus services will operate between Ealing Broadway and Slough. According to National Rail, the buses will serve all intermediate stations between the two locations and will also call at Boston Manor for London Underground connections.
For passengers travelling from Slough, replacement buses will operate to stations including Maidenhead, Burnham and Taplow. The Reading Chronicle reported that London Underground ticket acceptance will be in place at several stations in central London.
National Rail has also advised that Slough customers can travel via Windsor & Eton Central, then walk to Windsor & Eton Riverside for services to and from London Waterloo.
Could rugby fixtures add pressure?
Passengers using South Western Railway services have been warned that trains could be particularly busy because of international rugby fixtures at Twickenham.
As reported by the Reading Chronicle, boarding controls and queuing systems are expected during the weekend. The warning is particularly relevant for passengers travelling through Guildford towards Twickenham and London Waterloo.
GWR has said that journeys may take longer than usual and that trains are likely to be busier during the closure period.
What has GWR said?
GWR operations director Richard Rowland said the operator had worked with Network Rail and industry partners to put alternative routes in place.
As reported by the BBC, Mr Rowland said:
“Although trains won’t run into London Paddington for a short period, we’ve worked closely with Network Rail and our industry partners to put alternative routes in place, including GWR services from London Euston, and connections via Waterloo and Marylebone.”
He added: “This does however mean some journeys may take longer than usual; so we ask anyone travelling to or from London during this period to plan ahead and check before they travel.”
Mr Rowland also said that, once complete, the upgrade would enable trains to move through the junction more smoothly, helping to reduce congestion and improve performance across the route.
Will there be further disruption?
Yes. Further rail improvement work is scheduled to affect all train services between London Paddington and Slough from December 27 to January 3.
The Reading Chronicle reported that the forthcoming disruption is part of a wider programme of rail improvements. Passengers have been advised to check before travelling and allow extra time for journeys during both the November closure and the later Christmas-period works.
Background of the development
The weekend closure is linked to Network Rail’s Dolphin Junction upgrade at Slough, a £27.8 million project intended to replace ageing infrastructure and improve the track layout and overhead line equipment. The work forms part of a broader programme of rail improvements across the Thames Valley.
The November 28 and 29 closure is preparatory work ahead of a larger phase of engineering between Christmas and New Year. Further disruption between London Paddington and Slough is scheduled from December 27 to January 3, while GWR services are due to regain access to Paddington from January 4.
Prediction: How this development can affect passengers
Reading passengers travelling to central London during the closure weekend are likely to face longer journeys, additional changes and busier trains. Those relying on direct Reading-to-Paddington services will need to use the Guildford and Waterloo route or consider alternative London terminals where available.
Commuters, airport travellers and people attending events in London may need to allow extra time, particularly if travelling on Sunday or during peak periods. Passengers using South Western Railway services could face additional pressure because of the Twickenham rugby fixtures, while those travelling to Heathrow will need to make separate arrangements because Heathrow Express and Elizabeth line airport services will be unavailable.
Businesses, event organisers and residents who depend on regular Reading-to-London travel may also need to adjust meeting times, delivery arrangements or weekend plans. The most practical step for affected passengers is to check journeys before travelling, allow additional time and consider travelling outside the busiest periods where possible.
